Watford Junction
2,246 delay minutes
The biggest share (31%) of the delay picked up at Watford Junction in the four weeks to 9 December 2023 came from signal, points and power faults.
53% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 54 | 2% | 8% | 2 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 690 | 31% | 16% | 25 a day, the most in 5 years | 13 |
| Weather and structures | 9 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 55 | 2% | 7% | 2 a day, more than 3 of the other 4 years | 9 |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 487 | 22% | 17% | 17 a day, the most in 5 years | 6 |
| The operators' causes | |||||
| Train faults | 317 | 14% | 16% | 11 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 167 | 7% | 11% | 6 a day, the least in 5 years | 4 |
| Stations | 81 | 4% | 3% | 3 a day, the least in 5 years | - |
| Operations | 46 | 2% | 5% | 2 a day, more than 2 of the other 4 years | 5 |
| Operator, other | 341 | 15% | 7% | 12 a day, the most in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 288 |
| IH | Power Supply And Distribution System Failure | 268 |
| II | Signalling lineside cable fault | 194 |
| VZ | Other passenger or external causes the responsibility of TOC | 141 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 131 |
| TG | Driver | 115 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 101 |
| MT | Confirmed train borne safety system faults (not cab based) | 80 |
| Q3 | NZ Pumps T | 51 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 43 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,582 |
| I1 | Overhead line/third rail defect | 6,526 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,976 |
| IB | Points failure (including no fault found) | 5,943 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 5,917 |
| TH | (Senior) Conductor/Train Manager | 4,843 |
| J3 | Axle Counter Failure | 4,453 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 3,880 |
| ZU | No Cause Identified After investigation by both Parties | 3,717 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,515 |