2,246 delay minutes

The biggest share (31%) of the delay picked up at Watford Junction in the four weeks to 9 December 2023 came from signal, points and power faults.

53% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track542%8% 2 a day, more than 1 of the other 4 years1
Signals, points and power69031%16% 25 a day, the most in 5 years13
Weather and structures9<1%7% 0 a day, more than 1 of the other 4 years-
Autumn552%7% 2 a day, more than 3 of the other 4 years9
External--4% 0 a day, the least in 5 years-
Network management48722%17% 17 a day, the most in 5 years6
The operators' causes
Train faults31714%16% 11 a day, more than 1 of the other 4 years3
Traincrew1677%11% 6 a day, the least in 5 years4
Stations814%3% 3 a day, the least in 5 years-
Operations462%5% 2 a day, more than 2 of the other 4 years5
Operator, other34115%7% 12 a day, the most in 5 years3

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)288
IHPower Supply And Distribution System Failure268
IISignalling lineside cable fault194
VZOther passenger or external causes the responsibility of TOC141
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure131
TGDriver115
VHPassenger Communication cord, door egress or emergency train alarm operated101
MTConfirmed train borne safety system faults (not cab based)80
Q3NZ Pumps T51
OCSignaller including mis-routing (not ERTM /ETCS related)43
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver9,582
I1Overhead line/third rail defect6,526
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,976
IBPoints failure (including no fault found)5,943
IRBroken/cracked/twisted/buckled/flawed rail5,917
TH(Senior) Conductor/Train Manager4,843
J3Axle Counter Failure4,453
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)3,880
ZUNo Cause Identified After investigation by both Parties3,717
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,515