Leaves on the Line

Wigan North Western

WGN North West route
CSV JSON

3,349 delay minutes

The biggest share (17%) of the delay picked up at Wigan North Western in the four weeks to 9 December 2023 came from faulty trains.

51% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3059%8% 11 a day, the most in 5 years1
Signals, points and power46614%16% 17 a day, more than 3 of the other 4 years5
Weather and structures33810%7% 12 a day, more than 3 of the other 4 years8
Autumn792%7% 3 a day, the least in 5 years-
External351%4% 1 a day, more than 1 of the other 4 years-
Network management41312%17% 15 a day, more than 3 of the other 4 years23
The operators' causes
Train faults58617%16% 21 a day, more than 2 of the other 4 years8
Traincrew53916%11% 19 a day, more than 2 of the other 4 years49
Stations692%3% 2 a day, the least in 5 years-
Operations36711%5% 13 a day, more than 3 of the other 4 years5
Operator, other1535%7% 5 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver390
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail317
IRBroken/cracked/twisted/buckled/flawed rail295
IBPoints failure (including no fault found)225
TZOther Passenger Train Operating Company causes207
MDTechnical failures below the solebar189
TH(Senior) Conductor/Train Manager145
MPRail / wheel interface, adhesion problems (including ice on the running rail)99
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)89
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure87
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver15,171
MDTechnical failures below the solebar7,568
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,094
TH(Senior) Conductor/Train Manager4,023
M7Door and Door system faults3,501
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)3,404
M8Technical failures above the Solebar3,189
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps3,081
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,799
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,734