971 delay minutes

Most of the delay picked up at Woodgrange Park in the four weeks to 9 December 2023 came from track faults.

23% of these minutes were knock-on from something that happened elsewhere first. 32% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track68070%8% 24 a day, the most in 5 years-
Signals, points and power101%16% 0 a day, more than 1 of the other 4 years-
Weather and structures152%7% 1 a day, more than 3 of the other 4 years-
Autumn121%7% 0 a day, the most in 5 years-
External3<1%4% 0 a day, more than 1 of the other 4 years-
Network management10811%17% 4 a day, more than 2 of the other 4 years3
The operators' causes
Train faults414%16% 1 a day, more than 2 of the other 4 years2
Traincrew374%11% 1 a day, more than 2 of the other 4 years-
Stations1<1%3% 0 a day, the least in 5 years-
Operations374%5% 1 a day, more than 3 of the other 4 years-
Operator, other283%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.680
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)54
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]30
MDTechnical failures below the solebar23
OCSignaller including mis-routing (not ERTM /ETCS related)16
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive15
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)15
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident13
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)12
ACWaiting Train preparation or completion of TOPS list/RT397310
Since 2018
CodeWhat Network Rail loggedMinutes
RBPassengers joining/alighting5,477
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,316
IQTrackside sign blown down, fallen over, missing, defective, mis-placed2,906
TGDriver2,035
MDTechnical failures below the solebar1,162
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,033
ICTrack circuit failure (including no fault found)973
JSCondition of Track TSR outside the Timetable Planning Rules872
M0Confirmed train cab based safety system fault (including GSMR)808
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)684