Woodgrange Park
971 delay minutes
Most of the delay picked up at Woodgrange Park in the four weeks to 9 December 2023 came from track faults.
23% of these minutes were knock-on from something that happened elsewhere first. 32% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 680 | 70% | 8% | 24 a day, the most in 5 years | - |
| Signals, points and power | 10 | 1% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Weather and structures | 15 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 12 | 1% | 7% | 0 a day, the most in 5 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 108 | 11% | 17% | 4 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 41 | 4% | 16% | 1 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 37 | 4% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 1 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 37 | 4% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 28 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 680 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 54 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 30 |
| MD | Technical failures below the solebar | 23 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 16 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 15 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 15 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 13 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 12 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RB | Passengers joining/alighting | 5,477 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,316 |
| IQ | Trackside sign blown down, fallen over, missing, defective, mis-placed | 2,906 |
| TG | Driver | 2,035 |
| MD | Technical failures below the solebar | 1,162 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,033 |
| IC | Track circuit failure (including no fault found) | 973 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 872 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 808 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 684 |