Leaves on the Line

Wigton

WGT North West route
CSV JSON

296 delay minutes

The biggest share (38%) of the delay picked up at Wigton in the four weeks to 9 December 2023 came from how the network was run.

44% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track72%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power3512%16% 1 a day, the most in 5 years-
Weather and structures3713%7% 1 a day, the most in 5 years-
Autumn124%7% 0 a day, the most in 5 years-
External--4% 0 a day, the least in 5 years-
Network management11338%17% 4 a day, the most in 5 years2
The operators' causes
Train faults134%16% 0 a day, more than 1 of the other 4 years-
Traincrew62%11% 0 a day, more than 2 of the other 4 years-
Stations134%3% 0 a day, more than 2 of the other 4 years-
Operations176%5% 1 a day, more than 2 of the other 4 years-
Operator, other4315%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)91
FWLate start/yard overtime not explained by Operator31
IBPoints failure (including no fault found)21
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions19
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)18
MPRail / wheel interface, adhesion problems (including ice on the running rail)12
Q3NZ Pumps T12
ICTrack circuit failure (including no fault found)11
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)11
M7Door and Door system faults7
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)482
RBPassengers joining/alighting470
ICTrack circuit failure (including no fault found)455
MDTechnical failures below the solebar427
JKFlooding not due to exceptional weather393
TGDriver385
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.374
IASignal failure (including no fault found)317
MCDiesel Loco failure, defect, attention286
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)215