Wigton
296 delay minutes
The biggest share (38%) of the delay picked up at Wigton in the four weeks to 9 December 2023 came from how the network was run.
44% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 2% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 35 | 12% | 16% | 1 a day, the most in 5 years | - |
| Weather and structures | 37 | 13% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 12 | 4% | 7% | 0 a day, the most in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 113 | 38% | 17% | 4 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 13 | 4% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Traincrew | 6 | 2% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 13 | 4% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 17 | 6% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 43 | 15% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 91 |
| FW | Late start/yard overtime not explained by Operator | 31 |
| IB | Points failure (including no fault found) | 21 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 19 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 18 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 12 |
| Q3 | NZ Pumps T | 12 |
| IC | Track circuit failure (including no fault found) | 11 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 11 |
| M7 | Door and Door system faults | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 482 |
| RB | Passengers joining/alighting | 470 |
| IC | Track circuit failure (including no fault found) | 455 |
| MD | Technical failures below the solebar | 427 |
| JK | Flooding not due to exceptional weather | 393 |
| TG | Driver | 385 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 374 |
| IA | Signal failure (including no fault found) | 317 |
| MC | Diesel Loco failure, defect, attention | 286 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 215 |