6,795 delay minutes

The biggest share (31%) of the delay picked up at West Hampstead Thameslink in the four weeks to 9 December 2023 came from how the network was run.

77% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4837%8% 17 a day, the least in 5 years-
Signals, points and power1,29719%16% 46 a day, the most in 5 years1
Weather and structures2213%7% 8 a day, more than 3 of the other 4 years-
Autumn3075%7% 11 a day, more than 2 of the other 4 years-
External881%4% 3 a day, more than 1 of the other 4 years1
Network management2,08631%17% 75 a day, more than 3 of the other 4 years13
The operators' causes
Train faults4967%16% 18 a day, more than 1 of the other 4 years4
Traincrew96114%11% 34 a day, more than 2 of the other 4 years13
Stations1713%3% 6 a day, the most in 5 years-
Operations29<1%5% 1 a day, the least in 5 years5
Operator, other65710%7% 23 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver726
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)434
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure343
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)323
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.305
Q3NZ Pumps T260
TTLeaf fall Neutral257
V8Train striking or being struck by a bird249
OCSignaller including mis-routing (not ERTM /ETCS related)236
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)231
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver44,813
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.28,094
M8Technical failures above the Solebar27,583
ICTrack circuit failure (including no fault found)15,430
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)13,416
IBPoints failure (including no fault found)13,239
OCSignaller including mis-routing (not ERTM /ETCS related)12,740
IRBroken/cracked/twisted/buckled/flawed rail10,879
TITraincrew rostering problem9,993
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)9,000