West Horndon
48 delay minutes
The biggest share (33%) of the delay picked up at West Horndon in the four weeks to 9 December 2023 came from how the network was run.
71% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 15% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 2 | 4% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 16 | 33% | 17% | 1 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 6 | 13% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 6 | 13% | 11% | 0 a day, the least in 5 years | - |
| Stations | 6 | 13% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 2 | 4% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 3 | 6% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 8 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5 |
| RB | Passengers joining/alighting | 5 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 3 |
| M8 | Technical failures above the Solebar | 3 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3 |
| TG | Driver | 3 |
| TW | Driver adhering to company professional driving standards or policy | 3 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3,170 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,368 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 612 |
| TG | Driver | 418 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 322 |
| RB | Passengers joining/alighting | 262 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 242 |
| I1 | Overhead line/third rail defect | 232 |
| TW | Driver adhering to company professional driving standards or policy | 203 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 196 |