Wickford
261 delay minutes
The biggest share (41%) of the delay picked up at Wickford in the four weeks to 9 December 2023 came from faulty trains.
68% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 32 | 12% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 21 | 8% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 11 | 4% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 28 | 11% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 35 | 13% | 17% | 1 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 108 | 41% | 16% | 4 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 4 | 2% | 11% | 0 a day, the least in 5 years | 1 |
| Stations | 3 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 2 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 18 | 7% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 65 |
| IB | Points failure (including no fault found) | 32 |
| M8 | Technical failures above the Solebar | 31 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 21 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 11 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 11 |
| Q3 | NZ Pumps T | 11 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 9 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 9 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 7 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 10,653 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,771 |
| TG | Driver | 1,198 |
| MD | Technical failures below the solebar | 900 |
| I1 | Overhead line/third rail defect | 778 |
| M7 | Door and Door system faults | 708 |
| QB | Planned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules) | 587 |
| M8 | Technical failures above the Solebar | 579 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 564 |
| I5 | Possession over-run from planned work | 533 |