Winchester
1,182 delay minutes
The biggest share (19%) of the delay picked up at Winchester in the four weeks to 9 December 2023 came from signal, points and power faults.
72% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 49 | 4% | 8% | 2 a day, more than 1 of the other 4 years | 5 |
| Signals, points and power | 229 | 19% | 16% | 8 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 32 | 3% | 7% | 1 a day, more than 2 of the other 4 years | 19 |
| Autumn | 97 | 8% | 7% | 3 a day, the most in 5 years | - |
| External | 15 | 1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 222 | 19% | 17% | 8 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 167 | 14% | 16% | 6 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 125 | 11% | 11% | 4 a day, the most in 5 years | 13 |
| Stations | 65 | 5% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 46 | 4% | 5% | 2 a day, more than 3 of the other 4 years | 3 |
| Operator, other | 136 | 12% | 7% | 5 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IE | Signalling Functional Power Supply Failure | 109 |
| MD | Technical failures below the solebar | 75 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 71 |
| IB | Points failure (including no fault found) | 64 |
| TG | Driver | 61 |
| Q3 | NZ Pumps T | 50 |
| TT | Leaf fall Neutral | 50 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 44 |
| QH | Adhesion problems due to leaf contamination | 44 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 35 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,366 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3,469 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,183 |
| IC | Track circuit failure (including no fault found) | 2,988 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,266 |
| IB | Points failure (including no fault found) | 2,002 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,816 |
| MD | Technical failures below the solebar | 1,785 |
| MC | Diesel Loco failure, defect, attention | 1,780 |
| TG | Driver | 1,458 |