Wakefield Westgate
3,204 delay minutes
The biggest share (16%) of the delay picked up at Wakefield Westgate in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
66% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 346 | 11% | 8% | 12 a day, the most in 5 years | - |
| Signals, points and power | 189 | 6% | 16% | 7 a day, the least in 5 years | 1 |
| Weather and structures | 301 | 9% | 7% | 11 a day, the most in 5 years | 3 |
| Autumn | 352 | 11% | 7% | 13 a day, the most in 5 years | - |
| External | 506 | 16% | 4% | 18 a day, the most in 5 years | 2 |
| Network management | 481 | 15% | 17% | 17 a day, more than 3 of the other 4 years | 7 |
| The operators' causes | |||||
| Train faults | 421 | 13% | 16% | 15 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 252 | 8% | 11% | 9 a day, more than 3 of the other 4 years | 2 |
| Stations | 72 | 2% | 3% | 3 a day, more than 3 of the other 4 years | - |
| Operations | 137 | 4% | 5% | 5 a day, more than 3 of the other 4 years | - |
| Operator, other | 149 | 5% | 7% | 5 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 468 |
| QJ | Special working for leaf-fall track circuit operation | 265 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 244 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 225 |
| OU | Delays not Investigated by Network Rail | 222 |
| TG | Driver | 171 |
| MU | Depot operating problem | 97 |
| Q3 | NZ Pumps T | 85 |
| M8 | Technical failures above the Solebar | 71 |
| TT | Leaf fall Neutral | 67 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 5,716 |
| TG | Driver | 5,527 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 4,991 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3,528 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,210 |
| M8 | Technical failures above the Solebar | 2,877 |
| IC | Track circuit failure (including no fault found) | 2,855 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,698 |
| IB | Points failure (including no fault found) | 2,594 |
| M7 | Door and Door system faults | 2,494 |