West Kirby
224 delay minutes
The biggest share (40%) of the delay picked up at West Kirby in the four weeks to 9 December 2023 came from faulty trains.
43% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 46 | 21% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Weather and structures | 5 | 2% | 7% | 0 a day, more than 1 of the other 4 years | 1 |
| Autumn | 25 | 11% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 3 | 1% | 4% | 0 a day, more than 1 of the other 4 years | 8 |
| Network management | 9 | 4% | 17% | 0 a day, the least in 5 years | 91 |
| The operators' causes | |||||
| Train faults | 89 | 40% | 16% | 3 a day, the most in 5 years | 2 |
| Traincrew | 6 | 3% | 11% | 0 a day, more than 1 of the other 4 years | 2 |
| Stations | 6 | 3% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 14 | 6% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 21 | 9% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 47 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 29 |
| Q3 | NZ Pumps T | 21 |
| M8 | Technical failures above the Solebar | 19 |
| TT | Leaf fall Neutral | 18 |
| MU | Depot operating problem | 12 |
| IK | Telecom equipment failure (including no fault found) | 10 |
| MD | Technical failures below the solebar | 9 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 9 |
| J3 | Axle Counter Failure | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 505 |
| MD | Technical failures below the solebar | 448 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 435 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 358 |
| IC | Track circuit failure (including no fault found) | 345 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 340 |
| J3 | Axle Counter Failure | 338 |
| TH | (Senior) Conductor/Train Manager | 332 |
| M7 | Door and Door system faults | 310 |
| Q3 | NZ Pumps T | 292 |