1,199 delay minutes

The biggest share (22%) of the delay picked up at Wakefield Kirkgate in the four weeks to 9 December 2023 came from how the network was run.

43% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track545%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power696%16% 2 a day, more than 1 of the other 4 years-
Weather and structures1119%7% 4 a day, the most in 5 years-
Autumn1079%7% 4 a day, more than 2 of the other 4 years-
External1109%4% 4 a day, the most in 5 years-
Network management26022%17% 9 a day, the most in 5 years5
The operators' causes
Train faults18916%16% 7 a day, more than 2 of the other 4 years2
Traincrew645%11% 2 a day, more than 1 of the other 4 years-
Stations575%3% 2 a day, more than 3 of the other 4 years-
Operations383%5% 1 a day, more than 1 of the other 4 years-
Operator, other14112%7% 5 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail115
Q3NZ Pumps T81
TTLeaf fall Neutral76
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)72
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail68
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)65
M8Technical failures above the Solebar63
ADOff Network Rail network Terminal or Yard staff shortage including reactionary congestion caused by shortage60
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.53
TGDriver48
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar2,289
TGDriver1,862
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,587
RCre-booked assistance for a person with reduced mobility joining/alighting,1,545
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,500
IBPoints failure (including no fault found)1,356
ICTrack circuit failure (including no fault found)1,176
M7Door and Door system faults1,115
OCSignaller including mis-routing (not ERTM /ETCS related)1,113
M8Technical failures above the Solebar1,073