1,199 delay minutes
The biggest share (22%) of the delay picked up at Wakefield Kirkgate in the four weeks to 9 December 2023 came from how the network was run.
43% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 54 | 5% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 69 | 6% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 111 | 9% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 107 | 9% | 7% | 4 a day, more than 2 of the other 4 years | - |
| External | 110 | 9% | 4% | 4 a day, the most in 5 years | - |
| Network management | 260 | 22% | 17% | 9 a day, the most in 5 years | 5 |
| The operators' causes | |||||
| Train faults | 189 | 16% | 16% | 7 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 64 | 5% | 11% | 2 a day, more than 1 of the other 4 years | - |
| Stations | 57 | 5% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 38 | 3% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 141 | 12% | 7% | 5 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 115 |
| Q3 | NZ Pumps T | 81 |
| TT | Leaf fall Neutral | 76 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 72 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 68 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 65 |
| M8 | Technical failures above the Solebar | 63 |
| AD | Off Network Rail network Terminal or Yard staff shortage including reactionary congestion caused by shortage | 60 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 53 |
| TG | Driver | 48 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 2,289 |
| TG | Driver | 1,862 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,587 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 1,545 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,500 |
| IB | Points failure (including no fault found) | 1,356 |
| IC | Track circuit failure (including no fault found) | 1,176 |
| M7 | Door and Door system faults | 1,115 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,113 |
| M8 | Technical failures above the Solebar | 1,073 |