715 delay minutes

The biggest share (23%) of the delay picked up at Wokingham in the four weeks to 9 December 2023 came from signal, points and power faults.

40% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track91%8% 0 a day, the least in 5 years-
Signals, points and power16423%16% 6 a day, more than 2 of the other 4 years-
Weather and structures91%7% 0 a day, more than 3 of the other 4 years-
Autumn8111%7% 3 a day, the least in 5 years-
External6<1%4% 0 a day, more than 1 of the other 4 years-
Network management11917%17% 4 a day, the least in 5 years-
The operators' causes
Train faults8312%16% 3 a day, more than 3 of the other 4 years-
Traincrew253%11% 1 a day, the least in 5 years-
Stations11416%3% 4 a day, more than 3 of the other 4 years-
Operations101%5% 0 a day, more than 1 of the other 4 years-
Operator, other9613%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I4OHLE/third rail power supply failure or reduction121
T2Delay at unstaffed station to non-DOO train96
Q3NZ Pumps T71
TTLeaf fall Neutral71
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)54
MDTechnical failures below the solebar41
ICTrack circuit failure (including no fault found)33
I6Delays as a result of line blocks / track patrols (including late handback)28
VHPassenger Communication cord, door egress or emergency train alarm operated25
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)14
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail7,110
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)6,379
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,541
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,919
ZUNo Cause Identified After investigation by both Parties2,787
TTLeaf fall Neutral2,463
Q3NZ Pumps T2,363
ICTrack circuit failure (including no fault found)2,264
T2Delay at unstaffed station to non-DOO train1,912
MDTechnical failures below the solebar1,855