Leaves on the Line

Whittlesea

WLE Anglia route
CSV JSON

494 delay minutes

The biggest share (33%) of the delay picked up at Whittlesea in the four weeks to 9 December 2023 came from track faults.

59% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track16133%8% 6 a day, more than 2 of the other 4 years-
Signals, points and power9319%16% 3 a day, more than 3 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn367%7% 1 a day, the most in 5 years-
External235%4% 1 a day, more than 3 of the other 4 years-
Network management12124%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults153%16% 1 a day, the least in 5 years-
Traincrew3<1%11% 0 a day, the least in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations214%5% 1 a day, more than 3 of the other 4 years-
Operator, other224%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.158
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure25
QJSpecial working for leaf-fall track circuit operation24
OUDelays not Investigated by Network Rail22
ICTrack circuit failure (including no fault found)20
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles19
J5Infrastructure Asset fault reported but proven to be mistaken14
OCSignaller including mis-routing (not ERTM /ETCS related)13
I1Overhead line/third rail defect12
I5Possession over-run from planned work11
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,976
ICTrack circuit failure (including no fault found)2,936
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,493
MCDiesel Loco failure, defect, attention905
IASignal failure (including no fault found)897
IRBroken/cracked/twisted/buckled/flawed rail816
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles815
OCSignaller including mis-routing (not ERTM /ETCS related)623
JATSR speed restrictions for track work outside of the Timetable Planning Rules599
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure564