3 delay minutes

Most of the delay picked up at Wembley Central in the four weeks to 9 December 2023 came from signal, points and power faults.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power3100%16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3
Since 2018
CodeWhat Network Rail loggedMinutes
I9Fires starting on Network Rail Infrastructure170
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)118
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure78
XLFire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents)44
ICTrack circuit failure (including no fault found)23
TATrain-crew/loco/stock/unit diagram issues15
I5Possession over-run from planned work9
MUDepot operating problem8
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)2