Leaves on the Line

Wilmslow

WML North West route
CSV JSON

765 delay minutes

The biggest share (17%) of the delay picked up at Wilmslow in the four weeks to 9 December 2023 came from faulty trains.

68% of these minutes were knock-on from something that happened elsewhere first. 76% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track8812%8% 3 a day, more than 3 of the other 4 years2
Signals, points and power7910%16% 3 a day, more than 2 of the other 4 years5
Weather and structures537%7% 2 a day, more than 2 of the other 4 years3
Autumn598%7% 2 a day, more than 1 of the other 4 years1
External182%4% 1 a day, more than 2 of the other 4 years1
Network management8311%17% 3 a day, the least in 5 years11
The operators' causes
Train faults12717%16% 5 a day, more than 1 of the other 4 years8
Traincrew588%11% 2 a day, more than 1 of the other 4 years1
Stations557%3% 2 a day, more than 1 of the other 4 years1
Operations263%5% 1 a day, the least in 5 years1
Operator, other12116%7% 4 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MPRail / wheel interface, adhesion problems (including ice on the running rail)111
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.88
TGDriver42
IBPoints failure (including no fault found)40
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail38
M8Technical failures above the Solebar30
QHAdhesion problems due to leaf contamination29
M7Door and Door system faults23
MTConfirmed train borne safety system faults (not cab based)19
RBPassengers joining/alighting18
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver2,528
MDTechnical failures below the solebar2,190
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,898
IBPoints failure (including no fault found)1,455
M7Door and Door system faults1,265
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,263
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,232
M8Technical failures above the Solebar1,122
ICTrack circuit failure (including no fault found)933
TH(Senior) Conductor/Train Manager924