Leaves on the Line

Windsor & Eton Central

WNC Western route
CSV JSON

77 delay minutes

The biggest share (42%) of the delay picked up at Windsor & Eton Central in the four weeks to 9 December 2023 came from track faults.

100% of these minutes were knock-on from something that happened elsewhere first. 69% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track3242%8%2
Signals, points and power2127%16%2
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management912%17%-
The operators' causes
Train faults1519%16%-
Traincrew--11%2
Stations--3%-
Operations--5%4
Operator, other--7%1

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail24
I1Overhead line/third rail defect11
MNBrake and brake systems faults; including wheel flats where no other cause had been identified10
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8
IBPoints failure (including no fault found)6
M7Door and Door system faults5
I2AC/DC trip (including no fault or cause found)4
OBDelayed by signaller not applying applicable regulating policy3
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)3
OUDelays not Investigated by Network Rail3
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar461
M7Door and Door system faults406
TGDriver334
M8Technical failures above the Solebar211
IBPoints failure (including no fault found)164
MNBrake and brake systems faults; including wheel flats where no other cause had been identified152
QMTrain schedule/STP Process including erroneous simplifiers151
ZUNo Cause Identified After investigation by both Parties126
IRBroken/cracked/twisted/buckled/flawed rail116
MTConfirmed train borne safety system faults (not cab based)108