Windsor & Eton Central
77 delay minutes
The biggest share (42%) of the delay picked up at Windsor & Eton Central in the four weeks to 9 December 2023 came from track faults.
100% of these minutes were knock-on from something that happened elsewhere first. 69% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 32 | 42% | 8% | 2 |
| Signals, points and power | 21 | 27% | 16% | 2 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 9 | 12% | 17% | - |
| The operators' causes | ||||
| Train faults | 15 | 19% | 16% | - |
| Traincrew | - | - | 11% | 2 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | 4 |
| Operator, other | - | - | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 24 |
| I1 | Overhead line/third rail defect | 11 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 10 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8 |
| IB | Points failure (including no fault found) | 6 |
| M7 | Door and Door system faults | 5 |
| I2 | AC/DC trip (including no fault or cause found) | 4 |
| OB | Delayed by signaller not applying applicable regulating policy | 3 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 3 |
| OU | Delays not Investigated by Network Rail | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 461 |
| M7 | Door and Door system faults | 406 |
| TG | Driver | 334 |
| M8 | Technical failures above the Solebar | 211 |
| IB | Points failure (including no fault found) | 164 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 152 |
| QM | Train schedule/STP Process including erroneous simplifiers | 151 |
| ZU | No Cause Identified After investigation by both Parties | 126 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 116 |
| MT | Confirmed train borne safety system faults (not cab based) | 108 |