461 delay minutes
The biggest share (27%) of the delay picked up at Windsor & Eton Riverside in the four weeks to 9 December 2023 came from signal, points and power faults.
80% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | 1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 123 | 27% | 16% | 4 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 5 | 1% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 42 | 9% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 19 | 4% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 63 | 14% | 17% | 2 a day, the least in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 21 | 5% | 16% | 1 a day, the least in 5 years | 8 |
| Traincrew | 68 | 15% | 11% | 2 a day, more than 1 of the other 4 years | 3 |
| Stations | 53 | 11% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 10 | 2% | 5% | 0 a day, the most in 5 years | 5 |
| Operator, other | 52 | 11% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 81 |
| I4 | OHLE/third rail power supply failure or reduction | 39 |
| TG | Driver | 39 |
| T2 | Delay at unstaffed station to non-DOO train | 33 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 28 |
| Q3 | NZ Pumps T | 25 |
| TT | Leaf fall Neutral | 25 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 24 |
| TI | Traincrew rostering problem | 19 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,757 |
| TG | Driver | 2,014 |
| IC | Track circuit failure (including no fault found) | 1,808 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,375 |
| TH | (Senior) Conductor/Train Manager | 1,166 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,103 |
| TI | Traincrew rostering problem | 1,057 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 948 |
| T2 | Delay at unstaffed station to non-DOO train | 845 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 777 |