606 delay minutes
The biggest share (21%) of the delay picked up at Wool in the four weeks to 9 December 2023 came from faulty trains.
84% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 49 | 8% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 111 | 18% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 8 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 48 | 8% | 7% | 2 a day, the most in 5 years | - |
| External | 40 | 7% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 117 | 19% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 125 | 21% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Traincrew | 10 | 2% | 11% | 0 a day, more than 1 of the other 4 years | - |
| Stations | 25 | 4% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 10 | 2% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 63 | 10% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 86 |
| IB | Points failure (including no fault found) | 29 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 29 |
| II | Signalling lineside cable fault | 27 |
| J3 | Axle Counter Failure | 27 |
| T2 | Delay at unstaffed station to non-DOO train | 25 |
| Q3 | NZ Pumps T | 22 |
| TT | Leaf fall Neutral | 22 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 22 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 1,872 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,797 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,577 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 869 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 837 |
| IB | Points failure (including no fault found) | 795 |
| T2 | Delay at unstaffed station to non-DOO train | 764 |
| MD | Technical failures below the solebar | 673 |
| TG | Driver | 668 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 657 |