0 delay minutes

No delay was picked up at Worcestershire Parkway in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
QMTrain schedule/STP Process including erroneous simplifiers45
QBPlanned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules)25
M7Door and Door system faults18
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)17
OUDelays not Investigated by Network Rail9
MVEngineers on-track equipment failure outside possession8
RBPassengers joining/alighting4
XDLevel Crossing Incidents including misuse and emergency services being prioritised over rail services4
Q1Takeback Pumps4
TZOther Passenger Train Operating Company causes4