Worcester Shrub Hill
2,405 delay minutes
The biggest share (26%) of the delay picked up at Worcester Shrub Hill in the four weeks to 9 December 2023 came from signal, points and power faults.
76% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 246 | 10% | 8% | 9 a day, more than 3 of the other 4 years | 5 |
| Signals, points and power | 617 | 26% | 16% | 22 a day, the most in 5 years | 28 |
| Weather and structures | 225 | 9% | 7% | 8 a day, the most in 5 years | 6 |
| Autumn | 32 | 1% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 14 | <1% | 4% | 1 a day, more than 1 of the other 4 years | 2 |
| Network management | 407 | 17% | 17% | 15 a day, more than 1 of the other 4 years | 41 |
| The operators' causes | |||||
| Train faults | 211 | 9% | 16% | 8 a day, more than 2 of the other 4 years | 13 |
| Traincrew | 506 | 21% | 11% | 18 a day, the most in 5 years | 52 |
| Stations | 64 | 3% | 3% | 2 a day, more than 2 of the other 4 years | 1 |
| Operations | 14 | <1% | 5% | 1 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 70 | 3% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 440 |
| IB | Points failure (including no fault found) | 270 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 145 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 118 |
| IA | Signal failure (including no fault found) | 98 |
| OU | Delays not Investigated by Network Rail | 89 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 88 |
| II | Signalling lineside cable fault | 81 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 80 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 73 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,609 |
| MD | Technical failures below the solebar | 4,897 |
| M8 | Technical failures above the Solebar | 3,207 |
| IB | Points failure (including no fault found) | 3,171 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,003 |
| TH | (Senior) Conductor/Train Manager | 2,705 |
| ZU | No Cause Identified After investigation by both Parties | 2,701 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,430 |
| M7 | Door and Door system faults | 2,409 |
| IA | Signal failure (including no fault found) | 2,327 |