Leaves on the Line

Worcester Shrub Hill

WOS Central route
CSV JSON

2,405 delay minutes

The biggest share (26%) of the delay picked up at Worcester Shrub Hill in the four weeks to 9 December 2023 came from signal, points and power faults.

76% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track24610%8% 9 a day, more than 3 of the other 4 years5
Signals, points and power61726%16% 22 a day, the most in 5 years28
Weather and structures2259%7% 8 a day, the most in 5 years6
Autumn321%7% 1 a day, more than 1 of the other 4 years-
External14<1%4% 1 a day, more than 1 of the other 4 years2
Network management40717%17% 15 a day, more than 1 of the other 4 years41
The operators' causes
Train faults2119%16% 8 a day, more than 2 of the other 4 years13
Traincrew50621%11% 18 a day, the most in 5 years52
Stations643%3% 2 a day, more than 2 of the other 4 years1
Operations14<1%5% 1 a day, more than 3 of the other 4 years2
Operator, other703%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver440
IBPoints failure (including no fault found)270
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure145
IRBroken/cracked/twisted/buckled/flawed rail118
IASignal failure (including no fault found)98
OUDelays not Investigated by Network Rail89
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.88
IISignalling lineside cable fault81
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)80
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)73
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver9,609
MDTechnical failures below the solebar4,897
M8Technical failures above the Solebar3,207
IBPoints failure (including no fault found)3,171
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,003
TH(Senior) Conductor/Train Manager2,705
ZUNo Cause Identified After investigation by both Parties2,701
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,430
M7Door and Door system faults2,409
IASignal failure (including no fault found)2,327