Wetheral
0 delay minutes
No delay was picked up at Wetheral in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 101 |
| DD | Technical Fleet Holding Code | 42 |
| Q1 | Takeback Pumps | 42 |
| IB | Points failure (including no fault found) | 38 |
| TC | Delays from Traincrew/loco/stock/unit diagrams issues resulting from an agreed mitigation resource plan, at 22:00 the day prior | 19 |
| OU | Delays not Investigated by Network Rail | 12 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 10 |
| OL | Signal Box not open during booked hours | 6 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3 |