Leaves on the Line

Wareham

WRM Wessex route
CSV JSON

234 delay minutes

The biggest share (37%) of the delay picked up at Wareham in the four weeks to 9 December 2023 came from how the network was run.

59% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track2310%8% 1 a day, the most in 5 years1
Signals, points and power115%16% 0 a day, more than 3 of the other 4 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn42%7% 0 a day, more than 2 of the other 4 years-
External188%4% 1 a day, more than 3 of the other 4 years-
Network management8737%17% 3 a day, more than 3 of the other 4 years-
The operators' causes
Train faults4921%16% 2 a day, the most in 5 years2
Traincrew63%11% 0 a day, more than 3 of the other 4 years-
Stations94%3% 0 a day, the most in 5 years-
Operations2611%5% 1 a day, the most in 5 years-
Operator, other1<1%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards51
MDTechnical failures below the solebar42
TBTrain cancelled or delayed at Train Operators request26
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.16
OCSignaller including mis-routing (not ERTM /ETCS related)12
I5Possession over-run from planned work11
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)9
IRBroken/cracked/twisted/buckled/flawed rail7
T2Delay at unstaffed station to non-DOO train6
XMExternal utility incident including gas, water mains, overhead power lines6
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)677
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure585
MDTechnical failures below the solebar555
XBVandalism or theft (including the placing of objects on the line)533
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.474
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles438
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards399
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)355
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail350
IRBroken/cracked/twisted/buckled/flawed rail327