234 delay minutes
The biggest share (37%) of the delay picked up at Wareham in the four weeks to 9 December 2023 came from how the network was run.
59% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 23 | 10% | 8% | 1 a day, the most in 5 years | 1 |
| Signals, points and power | 11 | 5% | 16% | 0 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 4 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 18 | 8% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 87 | 37% | 17% | 3 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 49 | 21% | 16% | 2 a day, the most in 5 years | 2 |
| Traincrew | 6 | 3% | 11% | 0 a day, more than 3 of the other 4 years | - |
| Stations | 9 | 4% | 3% | 0 a day, the most in 5 years | - |
| Operations | 26 | 11% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 1 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 51 |
| MD | Technical failures below the solebar | 42 |
| TB | Train cancelled or delayed at Train Operators request | 26 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 16 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 12 |
| I5 | Possession over-run from planned work | 11 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 9 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 7 |
| T2 | Delay at unstaffed station to non-DOO train | 6 |
| XM | External utility incident including gas, water mains, overhead power lines | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 677 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 585 |
| MD | Technical failures below the solebar | 555 |
| XB | Vandalism or theft (including the placing of objects on the line) | 533 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 474 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 438 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 399 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 355 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 350 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 327 |