Leaves on the Line

Warwick Parkway

WRP Central route
CSV JSON

0 delay minutes

No delay was picked up at Warwick Parkway in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
MCDiesel Loco failure, defect, attention103
V8Train striking or being struck by a bird21
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)17
IBPoints failure (including no fault found)15
ZUNo Cause Identified After investigation by both Parties9
VHPassenger Communication cord, door egress or emergency train alarm operated9
MDTechnical failures below the solebar7
QMTrain schedule/STP Process including erroneous simplifiers7
M7Door and Door system faults7
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)7