Leaves on the Line

West Ruislip

WRU Central route
CSV JSON

34 delay minutes

The biggest share (26%) of the delay picked up at West Ruislip in the four weeks to 9 December 2023 came from autumn leaves.

91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power721%16%-
Weather and structures--7%-
Autumn926%7%-
External515%4%-
Network management39%17%1
The operators' causes
Train faults515%16%2
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other515%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation8
IBPoints failure (including no fault found)7
M8Technical failures above the Solebar5
XBVandalism or theft (including the placing of objects on the line)5
VBVandalism or theft4
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)3
Q3NZ Pumps T1
TTLeaf fall Neutral1
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar302
TGDriver296
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.291
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure256
ICTrack circuit failure (including no fault found)215
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail153
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)149
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)117
OCSignaller including mis-routing (not ERTM /ETCS related)116
RBPassengers joining/alighting114