West Ruislip
34 delay minutes
The biggest share (26%) of the delay picked up at West Ruislip in the four weeks to 9 December 2023 came from autumn leaves.
91% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 7 | 21% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 9 | 26% | 7% | - |
| External | 5 | 15% | 4% | - |
| Network management | 3 | 9% | 17% | 1 |
| The operators' causes | ||||
| Train faults | 5 | 15% | 16% | 2 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 5 | 15% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 8 |
| IB | Points failure (including no fault found) | 7 |
| M8 | Technical failures above the Solebar | 5 |
| XB | Vandalism or theft (including the placing of objects on the line) | 5 |
| VB | Vandalism or theft | 4 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 3 |
| Q3 | NZ Pumps T | 1 |
| TT | Leaf fall Neutral | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 302 |
| TG | Driver | 296 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 291 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 256 |
| IC | Track circuit failure (including no fault found) | 215 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 153 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 149 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 117 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 116 |
| RB | Passengers joining/alighting | 114 |