Westbury (Wilts)
3,362 delay minutes
The biggest share (17%) of the delay picked up at Westbury (Wilts) in the four weeks to 9 December 2023 came from how the network was run.
57% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 153 | 5% | 8% | 5 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 581 | 17% | 16% | 21 a day, the most in 5 years | 8 |
| Weather and structures | 148 | 4% | 7% | 5 a day, the most in 5 years | 5 |
| Autumn | 81 | 2% | 7% | 3 a day, more than 2 of the other 4 years | 2 |
| External | 553 | 16% | 4% | 20 a day, the most in 5 years | 13 |
| Network management | 586 | 17% | 17% | 21 a day, more than 3 of the other 4 years | 37 |
| The operators' causes | |||||
| Train faults | 482 | 14% | 16% | 17 a day, more than 1 of the other 4 years | 8 |
| Traincrew | 559 | 17% | 11% | 20 a day, the most in 5 years | 58 |
| Stations | 56 | 2% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 24 | <1% | 5% | 1 a day, more than 1 of the other 4 years | 3 |
| Operator, other | 139 | 4% | 7% | 5 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 528 |
| TG | Driver | 499 |
| IB | Points failure (including no fault found) | 351 |
| OU | Delays not Investigated by Network Rail | 206 |
| M8 | Technical failures above the Solebar | 128 |
| MD | Technical failures below the solebar | 110 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 96 |
| J8 | OTM DAMAGE | 92 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 84 |
| J0 | Telecom equipment radio failure (GSM-R) | 79 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 12,537 |
| MD | Technical failures below the solebar | 7,033 |
| IB | Points failure (including no fault found) | 5,261 |
| M8 | Technical failures above the Solebar | 5,170 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,414 |
| M7 | Door and Door system faults | 3,855 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,556 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,858 |
| MC | Diesel Loco failure, defect, attention | 2,826 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,592 |