Winsford
1,625 delay minutes
The biggest share (25%) of the delay picked up at Winsford in the four weeks to 9 December 2023 came from faulty trains.
82% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 28 | 2% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 258 | 16% | 16% | 9 a day, more than 3 of the other 4 years | - |
| Weather and structures | 78 | 5% | 7% | 3 a day, more than 2 of the other 4 years | - |
| Autumn | 20 | 1% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 6 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 286 | 18% | 17% | 10 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 402 | 25% | 16% | 14 a day, more than 3 of the other 4 years | - |
| Traincrew | 336 | 21% | 11% | 12 a day, the most in 5 years | - |
| Stations | 45 | 3% | 3% | 2 a day, the least in 5 years | - |
| Operations | 82 | 5% | 5% | 3 a day, more than 2 of the other 4 years | - |
| Operator, other | 86 | 5% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 275 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 106 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 62 |
| M8 | Technical failures above the Solebar | 51 |
| IH | Power Supply And Distribution System Failure | 49 |
| MD | Technical failures below the solebar | 48 |
| ZU | No Cause Identified After investigation by both Parties | 47 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 46 |
| IB | Points failure (including no fault found) | 45 |
| M7 | Door and Door system faults | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,184 |
| ZU | No Cause Identified After investigation by both Parties | 2,793 |
| M8 | Technical failures above the Solebar | 2,762 |
| IB | Points failure (including no fault found) | 2,526 |
| MD | Technical failures below the solebar | 2,369 |
| TH | (Senior) Conductor/Train Manager | 2,306 |
| I1 | Overhead line/third rail defect | 2,242 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,033 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,943 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,862 |