1,625 delay minutes

The biggest share (25%) of the delay picked up at Winsford in the four weeks to 9 December 2023 came from faulty trains.

82% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track282%8% 1 a day, the least in 5 years-
Signals, points and power25816%16% 9 a day, more than 3 of the other 4 years-
Weather and structures785%7% 3 a day, more than 2 of the other 4 years-
Autumn201%7% 1 a day, more than 1 of the other 4 years-
External6<1%4% 0 a day, the least in 5 years-
Network management28618%17% 10 a day, more than 2 of the other 4 years-
The operators' causes
Train faults40225%16% 14 a day, more than 3 of the other 4 years-
Traincrew33621%11% 12 a day, the most in 5 years-
Stations453%3% 2 a day, the least in 5 years-
Operations825%5% 3 a day, more than 2 of the other 4 years-
Operator, other865%7% 3 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver275
MNBrake and brake systems faults; including wheel flats where no other cause had been identified106
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)62
M8Technical failures above the Solebar51
IHPower Supply And Distribution System Failure49
MDTechnical failures below the solebar48
ZUNo Cause Identified After investigation by both Parties47
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure46
IBPoints failure (including no fault found)45
M7Door and Door system faults44
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,184
ZUNo Cause Identified After investigation by both Parties2,793
M8Technical failures above the Solebar2,762
IBPoints failure (including no fault found)2,526
MDTechnical failures below the solebar2,369
TH(Senior) Conductor/Train Manager2,306
I1Overhead line/third rail defect2,242
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,033
IRBroken/cracked/twisted/buckled/flawed rail1,943
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,862