Walsall
1,331 delay minutes
The biggest share (24%) of the delay picked up at Walsall in the four weeks to 9 December 2023 came from autumn leaves.
45% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 36 | 3% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 260 | 20% | 16% | 9 a day, the most in 5 years | 1 |
| Weather and structures | 34 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| Autumn | 322 | 24% | 7% | 12 a day, the most in 5 years | - |
| External | 103 | 8% | 4% | 4 a day, more than 3 of the other 4 years | 1 |
| Network management | 88 | 7% | 17% | 3 a day, the least in 5 years | 4 |
| The operators' causes | |||||
| Train faults | 88 | 7% | 16% | 3 a day, the least in 5 years | 3 |
| Traincrew | 124 | 9% | 11% | 4 a day, the least in 5 years | 12 |
| Stations | 123 | 9% | 3% | 4 a day, more than 1 of the other 4 years | - |
| Operations | 10 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 144 | 11% | 7% | 5 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 207 |
| Q3 | NZ Pumps T | 115 |
| IB | Points failure (including no fault found) | 114 |
| TG | Driver | 106 |
| TT | Leaf fall Neutral | 79 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 72 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 64 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 53 |
| J3 | Axle Counter Failure | 53 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 41 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,314 |
| IC | Track circuit failure (including no fault found) | 3,611 |
| TH | (Senior) Conductor/Train Manager | 3,443 |
| Q1 | Takeback Pumps | 2,755 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,288 |
| ZU | No Cause Identified After investigation by both Parties | 2,191 |
| I1 | Overhead line/third rail defect | 1,841 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,777 |
| TZ | Other Passenger Train Operating Company causes | 1,766 |
| IB | Points failure (including no fault found) | 1,707 |