Whitlocks End

WTE Central route
CSV JSON

364 delay minutes

The biggest share (25%) of the delay picked up at Whitlocks End in the four weeks to 9 December 2023 came from traincrew problems.

25% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track164%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power6418%16% 2 a day, more than 2 of the other 4 years2
Weather and structures--7% 0 a day, the least in 5 years-
Autumn6217%7% 2 a day, more than 2 of the other 4 years-
External2<1%4% 0 a day, the least in 5 years1
Network management41%17% 0 a day, the least in 5 years2
The operators' causes
Train faults7521%16% 3 a day, more than 1 of the other 4 years-
Traincrew9225%11% 3 a day, more than 1 of the other 4 years16
Stations123%3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other3810%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver92
J3Axle Counter Failure46
Q3NZ Pumps T34
M8Technical failures above the Solebar30
QHAdhesion problems due to leaf contamination28
MPRail / wheel interface, adhesion problems (including ice on the running rail)21
TTLeaf fall Neutral17
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.16
MNBrake and brake systems faults; including wheel flats where no other cause had been identified14
MUDepot operating problem11
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,149
MDTechnical failures below the solebar1,715
TH(Senior) Conductor/Train Manager1,350
ICTrack circuit failure (including no fault found)1,026
ZUNo Cause Identified After investigation by both Parties1,011
MPRail / wheel interface, adhesion problems (including ice on the running rail)810
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.787
M8Technical failures above the Solebar717
J3Axle Counter Failure696
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure651