Watlington
59 delay minutes
The biggest share (24%) of the delay picked up at Watlington in the four weeks to 9 December 2023 came from other operator causes.
80% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 13 | 22% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 7 | 12% | 7% | - |
| External | 6 | 10% | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 13 | 22% | 16% | - |
| Traincrew | 6 | 10% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 14 | 24% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 10 |
| IC | Track circuit failure (including no fault found) | 7 |
| M8 | Technical failures above the Solebar | 7 |
| QJ | Special working for leaf-fall track circuit operation | 7 |
| IA | Signal failure (including no fault found) | 6 |
| M7 | Door and Door system faults | 6 |
| TI | Traincrew rostering problem | 6 |
| FW | Late start/yard overtime not explained by Operator | 4 |
| XB | Vandalism or theft (including the placing of objects on the line) | 3 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,437 |
| I1 | Overhead line/third rail defect | 402 |
| TG | Driver | 361 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 360 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 269 |
| IA | Signal failure (including no fault found) | 222 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 192 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 180 |
| IB | Points failure (including no fault found) | 172 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 162 |