Leaves on the Line

Whitehaven

WTH North West route
CSV JSON

480 delay minutes

The biggest share (35%) of the delay picked up at Whitehaven in the four weeks to 9 December 2023 came from how the network was run.

52% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track71%8% 0 a day, the least in 5 years-
Signals, points and power11524%16% 4 a day, the most in 5 years-
Weather and structures8017%7% 3 a day, more than 3 of the other 4 years9
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management16735%17% 6 a day, the most in 5 years13
The operators' causes
Train faults337%16% 1 a day, more than 2 of the other 4 years1
Traincrew419%11% 1 a day, more than 3 of the other 4 years5
Stations143%3% 1 a day, more than 2 of the other 4 years-
Operations245%5% 1 a day, more than 1 of the other 4 years1
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)77
IASignal failure (including no fault found)61
OCSignaller including mis-routing (not ERTM /ETCS related)49
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)28
TGDriver28
I5Possession over-run from planned work26
OUDelays not Investigated by Network Rail25
J0Telecom equipment radio failure (GSM-R)19
ICTrack circuit failure (including no fault found)16
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards14
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules1,628
JKFlooding not due to exceptional weather1,455
IASignal failure (including no fault found)1,444
TGDriver1,405
JBReactionary Delay to 'P' coded TSRs1,160
RBPassengers joining/alighting1,080
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)980
MDTechnical failures below the solebar934
ICTrack circuit failure (including no fault found)770
ILToken equipment failure (including no fault found)725