Witham (Essex)
353 delay minutes
The biggest share (28%) of the delay picked up at Witham (Essex) in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
73% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 8 | 2% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 32 | 9% | 16% | 1 a day, more than 1 of the other 4 years | 3 |
| Weather and structures | 19 | 5% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 18 | 5% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 99 | 28% | 4% | 4 a day, the most in 5 years | 1 |
| Network management | 52 | 15% | 17% | 2 a day, the least in 5 years | 7 |
| The operators' causes | |||||
| Train faults | 48 | 14% | 16% | 2 a day, the least in 5 years | 1 |
| Traincrew | 6 | 2% | 11% | 0 a day, the least in 5 years | - |
| Stations | 5 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 28 | 8% | 5% | 1 a day, more than 2 of the other 4 years | 2 |
| Operator, other | 39 | 11% | 7% | 1 a day, more than 1 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 77 |
| TA | Train-crew/loco/stock/unit diagram issues | 22 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 19 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 17 |
| Q3 | NZ Pumps T | 16 |
| J0 | Telecom equipment radio failure (GSM-R) | 13 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 12 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 12 |
| FW | Late start/yard overtime not explained by Operator | 11 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,564 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,698 |
| MD | Technical failures below the solebar | 2,522 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,287 |
| TG | Driver | 2,171 |
| M8 | Technical failures above the Solebar | 1,773 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,740 |
| M7 | Door and Door system faults | 1,611 |
| IB | Points failure (including no fault found) | 1,596 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,502 |