Leaves on the Line

Witton (West Midlands)

WTT Central route
CSV JSON

52 delay minutes

Most of the delay picked up at Witton (West Midlands) in the four weeks to 9 December 2023 came from problems at stations.

81% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%1
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations52100%3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)52
Since 2018
CodeWhat Network Rail loggedMinutes
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)327
TGDriver86
ICTrack circuit failure (including no fault found)46
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)38
IRBroken/cracked/twisted/buckled/flawed rail36
MPRail / wheel interface, adhesion problems (including ice on the running rail)34
VHPassenger Communication cord, door egress or emergency train alarm operated31
OCSignaller including mis-routing (not ERTM /ETCS related)22
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)19
MDTechnical failures below the solebar18