Wolverhampton
6,732 delay minutes
The biggest share (20%) of the delay picked up at Wolverhampton in the four weeks to 9 December 2023 came from signal, points and power faults.
70% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 180 | 3% | 8% | 6 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 1,336 | 20% | 16% | 48 a day, more than 3 of the other 4 years | 5 |
| Weather and structures | 127 | 2% | 7% | 5 a day, more than 1 of the other 4 years | 1 |
| Autumn | 570 | 8% | 7% | 20 a day, the most in 5 years | 3 |
| External | 115 | 2% | 4% | 4 a day, more than 1 of the other 4 years | 1 |
| Network management | 1,114 | 17% | 17% | 40 a day, the most in 5 years | 17 |
| The operators' causes | |||||
| Train faults | 1,305 | 19% | 16% | 47 a day, more than 3 of the other 4 years | 11 |
| Traincrew | 1,023 | 15% | 11% | 37 a day, more than 2 of the other 4 years | 37 |
| Stations | 411 | 6% | 3% | 15 a day, the least in 5 years | 2 |
| Operations | 160 | 2% | 5% | 6 a day, more than 2 of the other 4 years | 3 |
| Operator, other | 393 | 6% | 7% | 14 a day, the least in 5 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 671 |
| IB | Points failure (including no fault found) | 416 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 368 |
| OM | Technical failure associated with a Railhead conditioning train | 287 |
| J3 | Axle Counter Failure | 285 |
| QI | Cautioning due to railhead leaf contamination | 268 |
| MD | Technical failures below the solebar | 214 |
| Q3 | NZ Pumps T | 209 |
| II | Signalling lineside cable fault | 201 |
| TH | (Senior) Conductor/Train Manager | 199 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 25,927 |
| TH | (Senior) Conductor/Train Manager | 12,585 |
| J3 | Axle Counter Failure | 11,549 |
| IB | Points failure (including no fault found) | 9,622 |
| MD | Technical failures below the solebar | 9,242 |
| I1 | Overhead line/third rail defect | 8,629 |
| M8 | Technical failures above the Solebar | 8,242 |
| RB | Passengers joining/alighting | 6,593 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 6,410 |
| ZU | No Cause Identified After investigation by both Parties | 6,115 |