Woolwich Arsenal
100 delay minutes
Most of the delay picked up at Woolwich Arsenal in the four weeks to 9 December 2023 came from how the network was run.
41% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 9% | 8% | 0 a day, the most in 5 years | - |
| Signals, points and power | 3 | 3% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 2 | 2% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 53 | 53% | 17% | 2 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 6 | 6% | 16% | 0 a day, more than 1 of the other 4 years | - |
| Traincrew | 8 | 8% | 11% | 0 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 20 | 20% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 28 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 12 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 8 |
| TG | Driver | 8 |
| I7 | Engineer's train late into, from or failed in possession | 7 |
| M8 | Technical failures above the Solebar | 6 |
| QM | Train schedule/STP Process including erroneous simplifiers | 6 |
| VZ | Other passenger or external causes the responsibility of TOC | 6 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 2,010 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,360 |
| IB | Points failure (including no fault found) | 763 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 602 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 527 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 510 |
| TG | Driver | 484 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 470 |
| IK | Telecom equipment failure (including no fault found) | 388 |
| M7 | Door and Door system faults | 315 |