2,811 delay minutes

The biggest share (21%) of the delay picked up at Weybridge in the four weeks to 9 December 2023 came from signal, points and power faults.

62% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1214%8% 4 a day, more than 2 of the other 4 years-
Signals, points and power58021%16% 21 a day, the most in 5 years2
Weather and structures773%7% 3 a day, more than 3 of the other 4 years-
Autumn48817%7% 17 a day, the most in 5 years-
External13<1%4% 0 a day, more than 1 of the other 4 years-
Network management52219%17% 19 a day, more than 2 of the other 4 years1
The operators' causes
Train faults2027%16% 7 a day, more than 2 of the other 4 years4
Traincrew2208%11% 8 a day, more than 3 of the other 4 years16
Stations963%3% 3 a day, more than 2 of the other 4 years-
Operations9<1%5% 0 a day, more than 1 of the other 4 years1
Operator, other48417%7% 17 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T444
TTLeaf fall Neutral444
IBPoints failure (including no fault found)323
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)136
TGDriver130
OCSignaller including mis-routing (not ERTM /ETCS related)114
IJAWS/ATP/TPWS/Train stop/On track equipment failure88
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)77
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.69
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive60
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,376
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,521
IBPoints failure (including no fault found)4,558
TGDriver3,789
TTLeaf fall Neutral3,226
ICTrack circuit failure (including no fault found)3,160
MDTechnical failures below the solebar2,764
OCSignaller including mis-routing (not ERTM /ETCS related)2,679
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,587
Q3NZ Pumps T2,061