Leaves on the Line

Yatton

YAT Western route
CSV JSON

424 delay minutes

The biggest share (19%) of the delay picked up at Yatton in the four weeks to 9 December 2023 came from how the network was run.

77% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track256%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power5814%16% 2 a day, more than 1 of the other 4 years-
Weather and structures113%7% 0 a day, more than 1 of the other 4 years-
Autumn4611%7% 2 a day, the most in 5 years-
External143%4% 1 a day, more than 2 of the other 4 years-
Network management8119%17% 3 a day, the most in 5 years-
The operators' causes
Train faults6616%16% 2 a day, the least in 5 years-
Traincrew5613%11% 2 a day, the most in 5 years-
Stations61%3% 0 a day, the least in 5 years-
Operations215%5% 1 a day, the most in 5 years-
Operator, other4110%7% 1 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OUDelays not Investigated by Network Rail41
TGDriver39
Q3NZ Pumps T28
TTLeaf fall Neutral28
IBPoints failure (including no fault found)23
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.22
MNBrake and brake systems faults; including wheel flats where no other cause had been identified18
ZUNo Cause Identified After investigation by both Parties18
J0Telecom equipment radio failure (GSM-R)16
QHAdhesion problems due to leaf contamination14
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,854
TGDriver1,705
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,000
ICTrack circuit failure (including no fault found)974
RQUn-booked assistance for a person with reduced mobility joining/alighting,888
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles883
ZUNo Cause Identified After investigation by both Parties804
M7Door and Door system faults792
M8Technical failures above the Solebar756
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure658