Ystrad Mynach
636 delay minutes
The biggest share (26%) of the delay picked up at Ystrad Mynach in the four weeks to 9 December 2023 came from the operators' own operations.
62% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 3% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 139 | 22% | 16% | 5 a day, more than 2 of the other 4 years | 3 |
| Weather and structures | 9 | 1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 21 | 3% | 7% | 1 a day, the least in 5 years | - |
| External | 33 | 5% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 51 | 8% | 17% | 2 a day, more than 1 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 45 | 7% | 16% | 2 a day, the least in 5 years | 14 |
| Traincrew | 53 | 8% | 11% | 2 a day, more than 2 of the other 4 years | 3 |
| Stations | 63 | 10% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 168 | 26% | 5% | 6 a day, the most in 5 years | 2 |
| Operator, other | 32 | 5% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 168 |
| J3 | Axle Counter Failure | 139 |
| T2 | Delay at unstaffed station to non-DOO train | 56 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 33 |
| TG | Driver | 30 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 22 |
| MU | Depot operating problem | 18 |
| QI | Cautioning due to railhead leaf contamination | 18 |
| VB | Vandalism or theft | 18 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,741 |
| TG | Driver | 1,701 |
| J3 | Axle Counter Failure | 1,555 |
| T2 | Delay at unstaffed station to non-DOO train | 1,179 |
| M8 | Technical failures above the Solebar | 1,096 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 975 |
| TH | (Senior) Conductor/Train Manager | 861 |
| XP | BRIDGE HIT | 777 |
| OU | Delays not Investigated by Network Rail | 689 |
| TZ | Other Passenger Train Operating Company causes | 658 |