Yeovil Pen Mill
966 delay minutes
The biggest share (26%) of the delay picked up at Yeovil Pen Mill in the four weeks to 9 December 2023 came from autumn leaves.
55% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 80 | 8% | 8% | 3 a day, the most in 5 years | - |
| Signals, points and power | 65 | 7% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 191 | 20% | 7% | 7 a day, the most in 5 years | 3 |
| Autumn | 254 | 26% | 7% | 9 a day, the most in 5 years | 1 |
| External | 20 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 102 | 11% | 17% | 4 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 105 | 11% | 16% | 4 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 89 | 9% | 11% | 3 a day, the most in 5 years | - |
| Stations | 15 | 2% | 3% | 1 a day, the most in 5 years | - |
| Operations | 8 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 37 | 4% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QH | Adhesion problems due to leaf contamination | 151 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 91 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 72 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 65 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 57 |
| TG | Driver | 57 |
| IB | Points failure (including no fault found) | 46 |
| MU | Depot operating problem | 40 |
| Q3 | NZ Pumps T | 31 |
| TT | Leaf fall Neutral | 31 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 1,701 |
| TG | Driver | 1,625 |
| IB | Points failure (including no fault found) | 1,095 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,070 |
| ZU | No Cause Identified After investigation by both Parties | 876 |
| M7 | Door and Door system faults | 819 |
| IA | Signal failure (including no fault found) | 818 |
| M8 | Technical failures above the Solebar | 792 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 712 |
| IC | Track circuit failure (including no fault found) | 668 |