Yeovil Pen Mill

YVP Wessex route
CSV JSON

966 delay minutes

The biggest share (26%) of the delay picked up at Yeovil Pen Mill in the four weeks to 9 December 2023 came from autumn leaves.

55% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track808%8% 3 a day, the most in 5 years-
Signals, points and power657%16% 2 a day, more than 1 of the other 4 years-
Weather and structures19120%7% 7 a day, the most in 5 years3
Autumn25426%7% 9 a day, the most in 5 years1
External202%4% 1 a day, more than 2 of the other 4 years-
Network management10211%17% 4 a day, more than 1 of the other 4 years-
The operators' causes
Train faults10511%16% 4 a day, more than 3 of the other 4 years1
Traincrew899%11% 3 a day, the most in 5 years-
Stations152%3% 1 a day, the most in 5 years-
Operations8<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other374%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QHAdhesion problems due to leaf contamination151
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions91
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed72
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)65
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.57
TGDriver57
IBPoints failure (including no fault found)46
MUDepot operating problem40
Q3NZ Pumps T31
TTLeaf fall Neutral31
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,701
TGDriver1,625
IBPoints failure (including no fault found)1,095
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,070
ZUNo Cause Identified After investigation by both Parties876
M7Door and Door system faults819
IASignal failure (including no fault found)818
M8Technical failures above the Solebar792
JHCritical Rail Temperature speeds, (other than buckled rails)712
ICTrack circuit failure (including no fault found)668