Canada Water
182 delay minutes
The biggest share (33%) of the delay picked up at Canada Water in the four weeks to 9 December 2023 came from signal, points and power faults.
82% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 3% | 8% | 0 a day, the most in 5 years | - |
| Signals, points and power | 60 | 33% | 16% | 2 a day, the most in 5 years | 1 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 2 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 10 | 5% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 43 | 24% | 17% | 2 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 24 | 13% | 16% | 1 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 16 | 9% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 3 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 12 | 7% | 5% | 0 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 8 | 4% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 53 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 22 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 12 |
| TG | Driver | 10 |
| M8 | Technical failures above the Solebar | 8 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 8 |
| OA | Regulation Decision Made With Best Endeavours | 6 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 6 |
| XP | BRIDGE HIT | 6 |
| IA | Signal failure (including no fault found) | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,064 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 796 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 515 |
| RB | Passengers joining/alighting | 444 |
| OB | Delayed by signaller not applying applicable regulating policy | 386 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 353 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 331 |
| IC | Track circuit failure (including no fault found) | 302 |
| M7 | Door and Door system faults | 266 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 206 |