Leaves on the Line

Canada Water

ZCW Private railways route
CSV JSON

182 delay minutes

The biggest share (33%) of the delay picked up at Canada Water in the four weeks to 9 December 2023 came from signal, points and power faults.

82% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track53%8% 0 a day, the most in 5 years-
Signals, points and power6033%16% 2 a day, the most in 5 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn2<1%7% 0 a day, more than 3 of the other 4 years-
External105%4% 0 a day, more than 3 of the other 4 years-
Network management4324%17% 2 a day, more than 2 of the other 4 years-
The operators' causes
Train faults2413%16% 1 a day, more than 3 of the other 4 years2
Traincrew169%11% 1 a day, more than 1 of the other 4 years-
Stations32%3% 0 a day, more than 1 of the other 4 years-
Operations127%5% 0 a day, more than 3 of the other 4 years1
Operator, other84%7% 0 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure53
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)22
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)12
TGDriver10
M8Technical failures above the Solebar8
MNBrake and brake systems faults; including wheel flats where no other cause had been identified8
OARegulation Decision Made With Best Endeavours6
VHPassenger Communication cord, door egress or emergency train alarm operated6
XPBRIDGE HIT6
IASignal failure (including no fault found)5
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,064
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)796
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)515
RBPassengers joining/alighting444
OBDelayed by signaller not applying applicable regulating policy386
VHPassenger Communication cord, door egress or emergency train alarm operated353
OCSignaller including mis-routing (not ERTM /ETCS related)331
ICTrack circuit failure (including no fault found)302
M7Door and Door system faults266
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure206