Leaves on the Line

Farringdon

ZFD Kent route
CSV JSON

560 delay minutes

The biggest share (49%) of the delay picked up at Farringdon in the four weeks to 9 December 2023 came from signal, points and power faults.

48% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power27749%16% 10 a day, the most in 5 years-
Weather and structures3<1%7% 0 a day, the most in 5 years-
Autumn2<1%7% 0 a day, the least in 5 years-
External102%4% 0 a day, more than 1 of the other 4 years-
Network management9918%17% 4 a day, more than 2 of the other 4 years-
The operators' causes
Train faults346%16% 1 a day, the least in 5 years-
Traincrew10919%11% 4 a day, more than 3 of the other 4 years-
Stations193%3% 1 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other81%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
J3Axle Counter Failure246
TGDriver99
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)53
OCSignaller including mis-routing (not ERTM /ETCS related)28
M8Technical failures above the Solebar17
I1Overhead line/third rail defect12
TITraincrew rostering problem10
XBVandalism or theft (including the placing of objects on the line)10
RXStation delay due overcrowding due unplanned events or incident (line or station closure) where causal event is not determined9
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)9
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,024
M8Technical failures above the Solebar4,156
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,597
ICTrack circuit failure (including no fault found)2,370
TITraincrew rostering problem1,837
VHPassenger Communication cord, door egress or emergency train alarm operated1,158
I1Overhead line/third rail defect1,069
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,049
IBPoints failure (including no fault found)987
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards888