Leaves on the Line

Aberdeen

ABD Scotland route
CSV JSON

1,266 delay minutes

The biggest share (44%) of the delay picked up at Aberdeen in the four weeks to 9 December 2023 came from weather and structures.

48% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track786%8% 3 a day, more than 3 of the other 4 years4
Signals, points and power736%16% 3 a day, more than 2 of the other 4 years7
Weather and structures55444%7% 20 a day, the most in 5 years16
Autumn10<1%7% 0 a day, the least in 5 years-
External403%4% 1 a day, more than 2 of the other 4 years1
Network management937%17% 3 a day, more than 1 of the other 4 years146
The operators' causes
Train faults22518%16% 8 a day, more than 3 of the other 4 years22
Traincrew12710%11% 5 a day, more than 2 of the other 4 years11
Stations--3% 0 a day, the least in 5 years-
Operations464%5% 2 a day, the most in 5 years-
Operator, other212%7% 1 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions301
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure210
TGDriver124
M8Technical failures above the Solebar78
IRBroken/cracked/twisted/buckled/flawed rail68
MDTechnical failures below the solebar64
XPBRIDGE HIT40
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure37
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)31
MNBrake and brake systems faults; including wheel flats where no other cause had been identified29
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,696
M8Technical failures above the Solebar4,290
MDTechnical failures below the solebar4,108
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions3,343
ZUNo Cause Identified After investigation by both Parties3,094
MNBrake and brake systems faults; including wheel flats where no other cause had been identified2,469
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,248
IASignal failure (including no fault found)2,024
M7Door and Door system faults1,482
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,151