Leaves on the Line

Airdrie

ADR Scotland route
CSV JSON

274 delay minutes

The biggest share (41%) of the delay picked up at Airdrie in the four weeks to 9 December 2023 came from other operator causes.

72% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track62%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power--16% 0 a day, the least in 5 years4
Weather and structures2<1%7% 0 a day, more than 1 of the other 4 years-
Autumn269%7% 1 a day, more than 1 of the other 4 years-
External187%4% 1 a day, more than 3 of the other 4 years-
Network management5922%17% 2 a day, more than 3 of the other 4 years2
The operators' causes
Train faults259%16% 1 a day, the least in 5 years5
Traincrew176%11% 1 a day, more than 1 of the other 4 years-
Stations62%3% 0 a day, the most in 5 years-
Operations31%5% 0 a day, more than 1 of the other 4 years-
Operator, other11241%7% 4 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VBVandalism or theft62
OMTechnical failure associated with a Railhead conditioning train41
VHPassenger Communication cord, door egress or emergency train alarm operated24
Q3NZ Pumps T20
MPRail / wheel interface, adhesion problems (including ice on the running rail)19
TGDriver17
XBVandalism or theft (including the placing of objects on the line)13
M8Technical failures above the Solebar10
MUDepot operating problem8
I5Possession over-run from planned work7
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,678
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,158
M8Technical failures above the Solebar1,074
VHPassenger Communication cord, door egress or emergency train alarm operated383
MDTechnical failures below the solebar335
IBPoints failure (including no fault found)313
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)308
MNBrake and brake systems faults; including wheel flats where no other cause had been identified304
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)289
M7Door and Door system faults283