Leaves on the Line

Ardrossan Harbour

ADS Scotland route
CSV JSON

106 delay minutes

The biggest share (18%) of the delay picked up at Ardrossan Harbour in the four weeks to 9 December 2023 came from autumn leaves.

78% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power1817%16%-
Weather and structures55%7%-
Autumn1918%7%-
External--4%-
Network management98%17%-
The operators' causes
Train faults1716%16%-
Traincrew1211%11%-
Stations66%3%-
Operations33%5%-
Operator, other1716%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T17
MPRail / wheel interface, adhesion problems (including ice on the running rail)16
M8Technical failures above the Solebar13
TGDriver12
J0Telecom equipment radio failure (GSM-R)11
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles7
RQUn-booked assistance for a person with reduced mobility joining/alighting,6
J8OTM DAMAGE5
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed5
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)4
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver245
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure122
IBPoints failure (including no fault found)118
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions116
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)86
RMWaiting connections from other transport modes81
ICTrack circuit failure (including no fault found)75
I8Animal Strike or Incursion within the control of Network Rail75
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles72
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)69