590 delay minutes
The biggest share (35%) of the delay picked up at Abergavenny in the four weeks to 9 December 2023 came from signal, points and power faults.
18% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 204 | 35% | 16% | 7 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 27 | 5% | 17% | 1 a day, the least in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 128 | 22% | 16% | 5 a day, the most in 5 years | - |
| Traincrew | 53 | 9% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 103 | 17% | 3% | 4 a day, the most in 5 years | - |
| Operations | 47 | 8% | 5% | 2 a day, the most in 5 years | 1 |
| Operator, other | 29 | 5% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 156 |
| T2 | Delay at unstaffed station to non-DOO train | 103 |
| TZ | Other Passenger Train Operating Company causes | 47 |
| M8 | Technical failures above the Solebar | 43 |
| TG | Driver | 32 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 26 |
| ML | Wagons, coaches and parcel vehicle faults | 24 |
| M9 | Reported fleet equipment defect - no fault found | 23 |
| IA | Signal failure (including no fault found) | 15 |
| TH | (Senior) Conductor/Train Manager | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 2,451 |
| MD | Technical failures below the solebar | 1,996 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,537 |
| IK | Telecom equipment failure (including no fault found) | 1,296 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,122 |
| TG | Driver | 1,062 |
| M8 | Technical failures above the Solebar | 992 |
| OU | Delays not Investigated by Network Rail | 641 |
| TH | (Senior) Conductor/Train Manager | 588 |
| XP | BRIDGE HIT | 585 |