Alnmouth
514 delay minutes
The biggest share (21%) of the delay picked up at Alnmouth in the four weeks to 9 December 2023 came from signal, points and power faults.
49% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 27 | 5% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 109 | 21% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Weather and structures | 78 | 15% | 7% | 3 a day, more than 2 of the other 4 years | - |
| Autumn | 14 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 78 | 15% | 4% | 3 a day, more than 3 of the other 4 years | - |
| Network management | 109 | 21% | 17% | 4 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 54 | 11% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Traincrew | 19 | 4% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 5 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 12 | 2% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 10 | 2% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 66 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 53 |
| OU | Delays not Investigated by Network Rail | 49 |
| JK | Flooding not due to exceptional weather | 25 |
| XB | Vandalism or theft (including the placing of objects on the line) | 25 |
| I5 | Possession over-run from planned work | 23 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 23 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 22 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 20 |
| TG | Driver | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 4,990 |
| I1 | Overhead line/third rail defect | 3,294 |
| IB | Points failure (including no fault found) | 1,869 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 1,646 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,578 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,468 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,252 |
| TG | Driver | 1,197 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,175 |
| MD | Technical failures below the solebar | 1,149 |