514 delay minutes

The biggest share (21%) of the delay picked up at Alnmouth in the four weeks to 9 December 2023 came from signal, points and power faults.

49% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track275%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power10921%16% 4 a day, more than 2 of the other 4 years-
Weather and structures7815%7% 3 a day, more than 2 of the other 4 years-
Autumn143%7% 0 a day, more than 2 of the other 4 years-
External7815%4% 3 a day, more than 3 of the other 4 years-
Network management10921%17% 4 a day, the most in 5 years-
The operators' causes
Train faults5411%16% 2 a day, more than 1 of the other 4 years-
Traincrew194%11% 1 a day, more than 1 of the other 4 years-
Stations5<1%3% 0 a day, more than 1 of the other 4 years-
Operations122%5% 0 a day, more than 3 of the other 4 years-
Operator, other102%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)66
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)53
OUDelays not Investigated by Network Rail49
JKFlooding not due to exceptional weather25
XBVandalism or theft (including the placing of objects on the line)25
I5Possession over-run from planned work23
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure23
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)22
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.20
TGDriver19
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)4,990
I1Overhead line/third rail defect3,294
IBPoints failure (including no fault found)1,869
JATSR speed restrictions for track work outside of the Timetable Planning Rules1,646
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,578
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,468
IRBroken/cracked/twisted/buckled/flawed rail1,252
TGDriver1,197
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,175
MDTechnical failures below the solebar1,149