88 delay minutes

Most of the delay picked up at Alloa in the four weeks to 9 December 2023 came from other operator causes.

57% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power56%16%-
Weather and structures1011%7%-
Autumn22%7%-
External--4%-
Network management45%17%1
The operators' causes
Train faults33%16%2
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other6573%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
VWSevere weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions45
V8Train striking or being struck by a bird13
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions10
MPRail / wheel interface, adhesion problems (including ice on the running rail)5
I8Animal Strike or Incursion within the control of Network Rail4
IGBlock failure3
M8Technical failures above the Solebar3
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2
Q3NZ Pumps T2
TTLeaf fall Neutral2
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver529
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions520
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure210
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.193
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure190
M7Door and Door system faults186
M8Technical failures above the Solebar166
OCSignaller including mis-routing (not ERTM /ETCS related)150
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles150
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)98