Alloa
88 delay minutes
Most of the delay picked up at Alloa in the four weeks to 9 December 2023 came from other operator causes.
57% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 5 | 6% | 16% | - |
| Weather and structures | 10 | 11% | 7% | - |
| Autumn | 2 | 2% | 7% | - |
| External | - | - | 4% | - |
| Network management | 4 | 5% | 17% | 1 |
| The operators' causes | ||||
| Train faults | 3 | 3% | 16% | 2 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 65 | 73% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 45 |
| V8 | Train striking or being struck by a bird | 13 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 10 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 5 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 4 |
| IG | Block failure | 3 |
| M8 | Technical failures above the Solebar | 3 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2 |
| Q3 | NZ Pumps T | 2 |
| TT | Leaf fall Neutral | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 529 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 520 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 210 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 193 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 190 |
| M7 | Door and Door system faults | 186 |
| M8 | Technical failures above the Solebar | 166 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 150 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 150 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 98 |