Leaves on the Line

Amersham

AMR Chiltern route
CSV JSON

943 delay minutes

Most of the delay picked up at Amersham in the four weeks to 9 December 2023 came from the operators' own operations.

8% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track445%8% 2 a day, the most in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn17018%7% 6 a day, more than 3 of the other 4 years2
External101%4% 0 a day, the most in 5 years-
Network management404%17% 1 a day, more than 1 of the other 4 years-
The operators' causes
Train faults202%16% 1 a day, the least in 5 years1
Traincrew111%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations63768%5% 23 a day, the least in 5 years-
Operator, other111%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)629
QJSpecial working for leaf-fall track circuit operation141
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident29
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.24
JSCondition of Track TSR outside the Timetable Planning Rules20
QICautioning due to railhead leaf contamination13
Q3NZ Pumps T12
MDTechnical failures below the solebar9
MUDepot operating problem8
TGDriver8
Since 2018
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)28,906
VXExternal events occurring on the LUL or other non NR running lines1,509
ICTrack circuit failure (including no fault found)1,021
MDTechnical failures below the solebar959
TGDriver901
RBPassengers joining/alighting598
M7Door and Door system faults579
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident454
TZOther Passenger Train Operating Company causes416
IBPoints failure (including no fault found)403