Angmering
7 delay minutes
Most of the delay picked up at Angmering in the four weeks to 9 December 2023 came from traincrew problems.
14% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 1 | 14% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 6 | 86% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 58 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 42 |
| II | Signalling lineside cable fault | 38 |
| TG | Driver | 31 |
| T3 | Waiting connections from other transport modes | 31 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 26 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 23 |
| QB | Planned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules) | 21 |
| TZ | Other Passenger Train Operating Company causes | 18 |
| QM | Train schedule/STP Process including erroneous simplifiers | 9 |