Anniesland
1,003 delay minutes
The biggest share (16%) of the delay picked up at Anniesland in the four weeks to 9 December 2023 came from autumn leaves.
87% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 53 | 5% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 67 | 7% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 62 | 6% | 7% | 2 a day, more than 2 of the other 4 years | 1 |
| Autumn | 163 | 16% | 7% | 6 a day, more than 3 of the other 4 years | - |
| External | 31 | 3% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 132 | 13% | 17% | 5 a day, more than 1 of the other 4 years | 27 |
| The operators' causes | |||||
| Train faults | 148 | 15% | 16% | 5 a day, more than 1 of the other 4 years | 11 |
| Traincrew | 100 | 10% | 11% | 4 a day, more than 2 of the other 4 years | 7 |
| Stations | 41 | 4% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 54 | 5% | 5% | 2 a day, more than 1 of the other 4 years | - |
| Operator, other | 152 | 15% | 7% | 5 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 126 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 116 |
| TG | Driver | 76 |
| M8 | Technical failures above the Solebar | 60 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 47 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 40 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 33 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 32 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 29 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 5,424 |
| TG | Driver | 4,734 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 3,905 |
| M8 | Technical failures above the Solebar | 3,166 |
| JB | Reactionary Delay to 'P' coded TSRs | 2,847 |
| MD | Technical failures below the solebar | 1,902 |
| M7 | Door and Door system faults | 1,763 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,680 |
| Q3 | NZ Pumps T | 1,662 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,599 |