1,003 delay minutes

The biggest share (16%) of the delay picked up at Anniesland in the four weeks to 9 December 2023 came from autumn leaves.

87% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track535%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power677%16% 2 a day, more than 1 of the other 4 years1
Weather and structures626%7% 2 a day, more than 2 of the other 4 years1
Autumn16316%7% 6 a day, more than 3 of the other 4 years-
External313%4% 1 a day, more than 1 of the other 4 years-
Network management13213%17% 5 a day, more than 1 of the other 4 years27
The operators' causes
Train faults14815%16% 5 a day, more than 1 of the other 4 years11
Traincrew10010%11% 4 a day, more than 2 of the other 4 years7
Stations414%3% 1 a day, more than 3 of the other 4 years-
Operations545%5% 2 a day, more than 1 of the other 4 years-
Operator, other15215%7% 5 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T126
MPRail / wheel interface, adhesion problems (including ice on the running rail)116
TGDriver76
M8Technical failures above the Solebar60
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)47
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions40
RQUn-booked assistance for a person with reduced mobility joining/alighting,33
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)32
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed29
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.28
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)5,424
TGDriver4,734
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)3,905
M8Technical failures above the Solebar3,166
JBReactionary Delay to 'P' coded TSRs2,847
MDTechnical failures below the solebar1,902
M7Door and Door system faults1,763
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,680
Q3NZ Pumps T1,662
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,599