Arbroath
280 delay minutes
The biggest share (31%) of the delay picked up at Arbroath in the four weeks to 9 December 2023 came from weather and structures.
95% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 2% | 8% | 0 a day, the least in 5 years | 6 |
| Signals, points and power | 27 | 10% | 16% | 1 a day, more than 2 of the other 4 years | 3 |
| Weather and structures | 88 | 31% | 7% | 3 a day, more than 3 of the other 4 years | 7 |
| Autumn | 9 | 3% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 17 | 6% | 4% | 1 a day, more than 2 of the other 4 years | 2 |
| Network management | 32 | 11% | 17% | 1 a day, more than 1 of the other 4 years | 14 |
| The operators' causes | |||||
| Train faults | 58 | 21% | 16% | 2 a day, more than 2 of the other 4 years | 16 |
| Traincrew | 33 | 12% | 11% | 1 a day, more than 3 of the other 4 years | 8 |
| Stations | 3 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 9 | 3% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 75 |
| M8 | Technical failures above the Solebar | 37 |
| TG | Driver | 22 |
| ZU | No Cause Identified After investigation by both Parties | 16 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 13 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 13 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 11 |
| TH | (Senior) Conductor/Train Manager | 11 |
| XR | Cable vandalism or theft | 9 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZU | No Cause Identified After investigation by both Parties | 1,552 |
| MD | Technical failures below the solebar | 949 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 897 |
| M8 | Technical failures above the Solebar | 695 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 665 |
| TG | Driver | 661 |
| IA | Signal failure (including no fault found) | 484 |
| JB | Reactionary Delay to 'P' coded TSRs | 465 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 392 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 389 |